Conveyor Route Study

Mhlabeni Coal Mine — Mining Area A → Wash Plant

2–8 September 2026

Prepared 7 Sep 2026 by James Dlamini

Current situation

ItemDetail
Start locationMining Area A
DestinationWash Plant
TodayCoal is moved by truck over about 21 km.
Study typeConveyor route study

Route comparison

RouteDistanceFuture mine conflictTerrainWater crossingsOverall
Route A9.4 kmHighMedium3Good distance, but may conflict with future mining.
Route B (recommended)10.8 kmLowLow1Best balance of distance, terrain and future mine activity.
Route C12.1 kmLowMedium2Lower new land impact, but likely more expensive to build.

Route details

  • Route A — Shortest route

    Distance: 9.4 km

    Benefits: Shortest distance; Simple connection to the Wash Plant

    Concerns: Crosses future Mining Area B; More operational disruption risk

  • Route B — Recommended

    Distance: 10.8 km

    Benefits: Avoids known future mining area; Gentler terrain; Fewer water crossings; Good access for future maintenance

    Concerns: Slightly longer than Route A

  • Route C — Lowest new land disturbance

    Distance: 12.1 km

    Benefits: Uses more already-disturbed land; Avoids rehabilitation area

    Concerns: Longest route; More infrastructure required

Why Route B is recommended

  1. 1It avoids the known future mining area.
  2. 2It has gentler terrain.
  3. 3It has fewer water crossings.
  4. 4It gives good access for maintenance.
  5. 5It makes a reasonable connection to the Wash Plant.

Early economics

ItemDetail
Distance moved todayAbout 21 km by truck
Route B distanceAbout 10.8 km
Early indicationA conveyor could cost less to run than trucking over time.

Next recommended step

  1. 1Send Route B for engineering feasibility review.

This is an early planning study. Detailed engineering, surveys and approvals are still required.