What was reported?
The contractor reported that rehabilitation work is 100% complete.
Rehabilitation · Mhlabeni Coal Mine
Reported
100%
By Contractor
Observable
About 92%
From satellite pictures
Field check
Problem found
By Lerato Nkosi
Most of the planned rehabilitation area appears complete. However, approximately 4 hectares may still require attention.
Two satellite pictures of Rehabilitation Area R12, with the planned work drawn on top.

Now · 4 Sep 2026
Illustrative example. The shapes show roughly where the work was planned and what can be seen from above.
The contractor reported that rehabilitation work is 100% complete.
Most of the planned area shows signs of rehabilitation. Around 4 hectares does not yet appear consistent with the surrounding completed area.
The inspection found several patches with poor vegetation recovery and visible erosion.
The environmental team should review the affected area before the project is closed.
High confidence
The difference is clearly visible in the latest satellite image.
Field inspection completed by: Lerato Nkosi · 7 Sep 2026 at 15:05
Result: There is a problem
Demo — illustrative example. The percentages shown here are examples for this demo mine, not measurements from a real site.